RESUME (Page 2)

ERIC B. FARRELL



EMPLOYMENT HISTORY (Cont.)

February 1990 to May 1990 Montana-Dakota Utilities, Coyote Power Plant Unit I Contracted to ABB Combustion Engineering, Environmental Systems Division Birmingham, Alabama. Senior Piping Designer on dry flue gas desulfurization and recovery project. Manual drafting.

July 1989 to January 1990 Amoco Chemical Company, Sulfone Monomer Plant No. 2 Contracted to Rust International Corporation, Birmingham, Alabama. Senior Piping Designer/Checker on Sulfone Monomer Chemical Plant.

May 1988 to June 1989 Dow Corning Corporation, NAMEX Project Contracted to Rust International Corporation, Birmingham, Alabama. Senior Piping Designer/Checker on Silicone Plant production facilities.

February 1988 to April 1988 Mobile Oil Corporation, Ferndale Refinery Contracted to Chiyoda International Corporation, Seattle, Washington. Senior Piping Designer/Checker on LSR-Gasoline Splitter Re-Vamp Project. Field and office assignments, manual drafting.

April 1986 to October 1986 The Upjohn Company, 225 Expansion Project Contracted to The Upjohn Company, Kalamazoo, Michigan. Senior Piping Designer on Minoxidil Chemical Plant Expansion Project. Utilized Intergraph Microstation for design assistance. Field and office assignments.

July 1984 to April 1986 Dow Corning Corporation Contracted to Dow Corning, Facilities Engineering Division, Midland, Michigan. Senior Piping Designer/Checker on 1984 PHARO, HOST, 3104 Emulsion Development, 5 Methyl Chloride, Carrollton Plant. Trained and utilized Intergraph 2D/3D/PDS for design assistance. Field and office assignments.

March 1984 to July 1984 Perry Nuclear Plant Unit 1, Perry, Ohio Contracted to Pullman Power Products Corporation. Field Engineer. Piping/Pipe support retrofit programs. Inspections of ASME/ANSI piping/pipe supports for NRC 79/14 "walkdown" procedures. Field assignment.

May 1983 to November 1983 Marble Hill Nuclear Generation Station Units 1 & 2, New Washington, Indiana Contracted to Pullman Construction Industries, Inc. Field Engineer. HVAC/Mechanical, construction of nuclear safety related seismic category II/I ductwork, supports and related HVAC equipment. Field assignment.

July 1982 to April 1983 Clinton Nuclear Power Station, Clinton, Illinois Contracted to Baldwin Associates. Field Engineer. Piping/Pipe support retrofit programs. Inspections of ASME/ANSI piping/pipe supports for NRC 79/14 "walkdown" procedures. Field assignment.

December 1981 to July 1982 Midland Nuclear Plant Units 1 & 2, Midland, Michigan Contracted to Bechtel Power Corporation. Piping Designer/Field Engineer. Piping design and inspections of small bore piping related to the NSSS Systems. Field assignment, manual drafting.

October 1981 to November 1981 WNP-2 WPPSS Nuclear Generation Facility, Richland, Washington Contracted to WSH/BOECON/GERI, Inc. Field Engineer. Piping Quality Document review for 215-contract turnover. Trained as AWS weld inspector, As-built piping and pipe support inspections. Field assignment.

January 1980 to October 1981 Midland Nuclear Power Plant Units 1 & 2, Midland, Michigan Contracted to Bechtel Power Corporation. Piping Designer. Large and small bore piping, as-built inspections of NSSS Piping. Field assignment, manual drafting.

May 1979 to January 1980 NORPAC II Publishers Paper Mill, Rust Engineering Company, Portland, Oregon. Piping Designer/Industrial Model Builder on Pulp Paper Mill Expansion Project.

June 1976 to May 1979 Bechtel Power Corporation, Los Angeles, California. Industrial Model builder/Piping Designer/Checker. On various Nuclear Projects (Palo Verde Nuclear Generating Station Units 1 & 2, Maanshan Nuclear Generating Station Units 1 & 2, Alvin W. Vogtle Nuclear Power Plant Units 1 & 2, and San Onofre Nuclear Generating Station Units 2 & 3.) Utilized industrial engineering models for design assistance. Manual drafting.



MILITARY

May 1968 to November 1970 U.S. Army. Two Vietnam duty tours. Honorable discharge. Department of Defense "SECRET" Security Clearance.


OTHER

Valid United States Passport. References available on request.